# How To Review Reforecast Run History

## Objective

Find an earlier reforecast run and see when it ran, what period it covered, and whether it completed.

## Environment

- You have access to a generated forecast with one or more reforecast runs.

## Resolution

1. Open the forecast and select **Reforecast**.
2. Find the runs table. It lists runs newest first by **Run time** and shows **Status**, training window, and reforecast window. A scheduled run is labeled **Scheduled**.
3. Select **View details** for a run. Check its scope, status, warnings, and comparison data before drawing conclusions from it.
4. Return to the runs table to inspect another run. Use [How To Compare A Reforecast With The Baseline](/help/articles/compare-a-reforecast-with-the-baseline/) when you want to understand how one run changes the demand view.

> Canonical page: https://zenops.cx/help/articles/review-forecast-run-history/
> Audience: For planners and managers
> Summary: Find earlier reforecast runs and inspect their status and scope.

## Notes on this article

### Note: Use the Reforecast tab for runs

After step 2 in resolution. The forecast’s History tab tracks historical data sync activity; it does not list reforecast results.

## Visual references

- The Reforecast tab lists scheduled and completed runs with their run times, training windows, forecast windows, and status.: [ZenOps WFM Reforecast page for Support 2025–2026, showing automatic schedule settings and a table of upcoming and completed reforecast runs.](https://zenops.cx/help/assets/reforecast-runs.png)
